{"id":6288,"date":"2025-09-22T11:15:57","date_gmt":"2025-09-22T09:15:57","guid":{"rendered":"https:\/\/serom.cat\/serveis-i-manteniment\/hospitals\/"},"modified":"2026-06-09T06:41:29","modified_gmt":"2026-06-09T04:41:29","slug":"hospitals","status":"publish","type":"servei","link":"https:\/\/serom.cat\/en\/services-and-maintenance\/hospitals\/","title":{"rendered":"Hospitals"},"content":{"rendered":"\n<div class=\"wp-block-calafgrup-cabecera mod-cabecera f16_9\"><div class=\"slider\">\n<div class=\"wp-block-calafgrup-cabecera-interior slide\"><div class=\"maq-contenidor\" style=\"backdrop-filter: blur(0px)\"><div class=\"text\">\n<h1 class=\"wp-block-heading has-text-align-left is-style-com_titular_gegant has-blanc-color has-text-color has-link-color wp-elements-1\">Hospital Construction<\/h1>\n\n\n\n<p class=\"is-style-com-boto-taronja wp-block-paragraph\">High-Complexity Hospital Projects<\/p>\n<\/div><\/div><div class=\"image\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-hospital-del-mar-5.jpg)\"><\/div><div style=\"background: #000; opacity: calc(30\/100);\" class=\"capa-color\"><\/div><\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-calafgrup-breadcrumb mod_breadcrumb\"><div class=\"callback-wrapper\"><\/div><\/div>\n\n<div class=\"wp-block-calafgrup-franja mod-franja sense_background marge-superior- marge-inferior-gran padding_fondo _alineacio_\" data-aos=\"fade-up\" data-aos-delay=\"300\"><div class=\"maq-contenidor fullwidth\"><div class=\"maq-inner\">\n<div class=\"wp-block-calafgrup-columnes-grid mod-columnes-grid gap-gran defam_dsk-6 defam_tbl-6 defam_mob-12\" data-aos=\"fade-up\" data-aos-delay=\"300\">\n<div class=\"wp-block-calafgrup-columna-grid mod-cgw\"><div class=\"mod-grid-responsive valign-superior\">\n<h2 class=\"wp-block-heading is-style-com_titular_1 has-taronja-color has-text-color has-link-color wp-elements-2\">We build hospitals that are operational from day one<br\/><\/h2>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-columna-grid mod-cgw\"><div class=\"mod-grid-responsive valign-superior\">\n<p class=\"is-style-com_titular_peq wp-block-paragraph\">A hospital does not allow for adaptation periods or margins of error. It is an infrastructure that must respond with precision from the moment it becomes operational, with critical systems functioning, clear pathways, and perfectly coordinated facilities. Building a hospital means intervening in an environment where every construction decision has a direct impact on healthcare activity.  <\/p>\n\n\n\n<p class=\"is-style-default wp-block-paragraph\">At SEROM, we approach hospital projects with exhaustive technical planning and construction organization designed to protect the facility&#8217;s operations. We coordinate structure, architecture, and installations with a global vision, ensuring compatibility, efficient execution sequences, and strict quality control. Our objective is not just to complete a project, but to guarantee that the building functions with full reliability from day one.   We also build <a href=\"https:\/\/serom.cat\/serveis-i-manteniment\/cliniques\/\" data-type=\"servei\" data-id=\"2292\">clinics<\/a> and <a href=\"https:\/\/serom.cat\/serveis-i-manteniment\/centres-datencio-primaria\/\" data-type=\"servei\" data-id=\"2294\">primary care centers<\/a>.<\/p>\n<\/div><\/div>\n<\/div>\n<\/div><\/div><div class=\"background\"><\/div><\/div>\n\n<div style=\"height:6vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-calafgrup-marquesrelacionades mod_noticies_relacionades com_relacionats\"><div class=\"intro\">\n<h2 class=\"wp-block-heading has-text-align-center is-style-com_titular_1 has-taronja-color has-text-color has-link-color wp-elements-3\">They trust us<\/h2>\n\n\n\n<div style=\"height:6vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><div class=\"callback-wrapper\"><\/div><\/div>\n\n<div style=\"height:6vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-calafgrup-carrusel mod-carrusel\" data-aos=\"fade-up\" data-aos-delay=\"300\"><div class=\"maq-inner\"><div class=\"slider_thumbs\">\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/SG25080_7018-2-digital.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"236\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/SG25080_7018-2-digital-300x236.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"3123\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/SG25080_7018-2-digital-300x236.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/SG25080_7018-2-digital-1024x804.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/SG25080_7018-2-digital-768x603.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/SG25080_7018-2-digital-1536x1206.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/SG25080_7018-2-digital.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/SG25080_7018-2-digital-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-3-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"187\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-3-300x187.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"3205\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-3-300x187.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-3-1024x640.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-3-768x480.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-3-1536x960.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-3-2048x1280.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-3-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"3207\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-300x200.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-1024x683.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-768x512.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-1536x1024.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-2048x1365.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-600x400.jpg 600w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-hospital-del-mar-3.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"264\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-hospital-del-mar-3-300x264.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"3059\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-hospital-del-mar-3-300x264.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-hospital-del-mar-3-1024x900.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-hospital-del-mar-3-768x675.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-hospital-del-mar-3-1536x1350.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-hospital-del-mar-3.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-hospital-del-mar-3-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/SG25080_6818-2-digital.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"202\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/SG25080_6818-2-digital-300x202.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"3121\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/SG25080_6818-2-digital-300x202.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/SG25080_6818-2-digital-1024x691.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/SG25080_6818-2-digital-768x518.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/SG25080_6818-2-digital-1536x1036.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/SG25080_6818-2-digital.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/SG25080_6818-2-digital-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-2-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-2-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"3204\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-2-300x200.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-2-1024x683.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-2-768x512.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-2-1536x1024.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-2-2048x1365.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-2-600x400.jpg 600w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-hospitals-creu-blanca-2-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-4-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-4-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"3057\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-4-300x200.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-4-1024x683.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-4-768x512.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-4-1536x1024.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-4-2048x1365.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-4-600x400.jpg 600w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-4-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n<\/div><\/div><\/div>\n\n<div class=\"wp-block-calafgrup-franja mod-franja sense_background marge-superior-gran marge-inferior-gran padding_fondo _alineacio_\" data-aos=\"fade-up\" data-aos-delay=\"300\"><div class=\"maq-contenidor fullwidth\"><div class=\"maq-inner\">\n<h2 class=\"wp-block-heading is-style-com_titular_gegant\">We design and execute hospitals built to last for decades<\/h2>\n<\/div><\/div><div class=\"background\"><\/div><\/div>\n\n<div style=\"height:6vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-calafgrup-ajedrez mod-escacs\">\n<div class=\"wp-block-calafgrup-ajedrez-interior interior cols_2 responsive-\" data-aos=\"fade-up\" data-aos-delay=\"300\"><div class=\"col esq imatge_fons\"><div class=\"bg-img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-hospital-del-mar.jpg)\"><\/div><\/div><div class=\"col dreta bloc_text\"><div class=\"mig-contenidor\"><div class=\"text-wrapper\">\n<div style=\"height:10vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading is-style-com_titular_1 has-blanctext-color has-text-color has-link-color wp-elements-4\">New General Hospitals<\/h3>\n\n\n\n<div style=\"height:6vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"is-style-default wp-block-paragraph\">We develop new hospital constructions with an integral vision of the building, coordinating everything from the structure to critical installations with exhaustive planning. In these types of projects, the key is to ensure coherence between the functional program, healthcare flows, and technical systems, guaranteeing that each area\u2014hospitalization, outpatient clinics, emergency services, or central services\u2014meets operational requirements from day one. We work with a construction organization that allows us to anticipate interferences, optimize sequences, and ensure that the building is delivered fully operational and aligned with current regulatory and healthcare standards.  <\/p>\n\n\n\n<div style=\"height:10vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div><div style=\"background: #878787;\" class=\"capa-color\"><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-ajedrez-interior interior cols_2 responsive-dreta_dalt\" data-aos=\"fade-up\" data-aos-delay=\"300\"><div class=\"col esq bloc_text\"><div class=\"mig-contenidor\"><div class=\"text-wrapper\">\n<div style=\"height:10vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading is-style-com_titular_1 has-taronja-color has-text-color has-link-color wp-elements-5\">Specialized Hospital Blocks<\/h3>\n\n\n\n<div style=\"height:6vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"is-style-default has-taronja-color has-text-color has-link-color wp-elements-6 wp-block-paragraph\">We construct highly specialized hospital units such as surgical blocks, diagnostic imaging areas, intensive care units, or maternal and child areas, where the concentration of installations and technology demands millimeter-precise coordination. In these environments, the integration between architecture and technical systems is crucial: differential pressures, environmental control, medical gas supply, electrical redundancies, and specific safety requirements. We execute these spaces with rigorous technical criteria, ensuring compatibility, accessibility for maintenance, and full clinical functionality.  <\/p>\n\n\n\n<div style=\"height:10vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div><\/div><div class=\"col dreta imatge_fons\"><div class=\"bg-img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria.jpg)\"><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-ajedrez-interior interior cols_2 responsive-\" data-aos=\"fade-up\" data-aos-delay=\"300\"><div class=\"col esq imatge_fons\"><div class=\"bg-img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/SG25080_6280-digital.jpg)\"><\/div><\/div><div class=\"col dreta bloc_text\"><div class=\"mig-contenidor\"><div class=\"text-wrapper\">\n<div style=\"height:10vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading is-style-com_titular_1 has-blanctext-color has-text-color has-link-color wp-elements-7\">Technical Infrastructure and Critical Systems<\/h3>\n\n\n\n<div style=\"height:6vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"is-style-default wp-block-paragraph\">In a newly built hospital, the technical infrastructure is as relevant as the healthcare spaces. We develop central plant rooms, technical rooms, hospital HVAC systems, medical gas networks, electrical systems with redundant power supply, and fire protection infrastructures with specific standards for the healthcare sector. The correct implementation of these systems guarantees safety, operational continuity, and long-term energy efficiency. We plan their execution with a global building vision, ensuring accessibility, maintainability, and capacity for future evolution.   <\/p>\n\n\n\n<div style=\"height:10vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div><div style=\"background: #878787;\" class=\"capa-color\"><\/div><\/div><\/div>\n<\/div>\n\n<div style=\"height:15vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-group is-nowrap is-layout-flex wp-container-core-group-is-layout-8f761849 wp-block-group-is-layout-flex\">\n<div class=\"wp-block-calafgrup-element-landing mod-el-landing\"><a href=\"#\"><div class=\"text\"><\/div><div class=\"image\"><\/div><\/a><\/div>\n<\/div>\n\n<div class=\"wp-block-calafgrup-projectesrelacionats mod_projectes_relacionats com_relacionats\"><div class=\"intro\">\n<h2 class=\"wp-block-heading is-style-com_titular_gegant\">Healthcare Projects<\/h2>\n<\/div><div class=\"callback-wrapper\"><div class=\"slider-posts\"><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/projects\/remodeling-of-the-facades-of-the-mutuaterrassa-university-hospital\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/Mutua-de-Terrassa5-600x600.jpg)\"><\/span><h3>Rehabilitation of the facades of the M\u00fatuaTerrassa University Hospital<\/h3><\/a><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/projects\/hospital-del-mar\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/SG25080_6579-2-digital-600x600.jpg)\"><\/span><h3>Hospital del Mar<\/h3><\/a><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/projects\/urbania\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/Urbania_op2-600x600.jpg)\"><\/span><h3>Urbania<\/h3><\/a><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/projects\/hotel-ibis-barcelona-center\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/SEROM_HOTEL-IBIS_04-600x600.jpg)\"><\/span><h3>Hotel Ibis 22@<\/h3><\/a><\/div><\/div><\/div><\/div>\n\n<div style=\"height:3vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-buttons is-content-justification-right is-layout-flex wp-container-core-buttons-is-layout-50212b78 wp-block-buttons-is-layout-flex\" style=\"margin-top:0;margin-bottom:0;padding-right:var(--wp--preset--spacing--50);padding-left:var(--wp--preset--spacing--50)\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/projects\/\">View all projects<\/a><\/div>\n<\/div>\n\n<div style=\"height:10vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-calafgrup-noticiesrelacionades mod_noticies_relacionades com_relacionats_serom com_relacionats\"><div class=\"maq-contenidor\"><div class=\"intro\">\n<h2 class=\"wp-block-heading is-style-com_titular_gegant\">News<\/h2>\n<\/div><\/div><div class=\"callback-wrapper\"><div class=\"slider-posts\"><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/building-the-future-of-research\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/VHIO_render-web-600x400.jpg)\"><\/span><h3>Building the future of research<\/h3><\/a><div class=\"excerpt\"><p>SEROM has participated in various projects linked to leading institutions in the fields of biomedicine, oncology, and precision medicine\u2014spaces designed to drive research, innovation, and the scientific advances of today and tomorrow.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/building-the-future-of-research\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/seal-commitment-professional-quality-cateb\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/CatebxSerom_Segell-compromis-qualitat-professional-600x400.jpg)\"><\/span><h3>SEROM receives the Cateb Seal of Commitment to Professional Quality<\/h3><\/a><div class=\"excerpt\"><p>SEROM has been recognized with the Cateb Seal of Commitment to Professional Quality, a distinction that identifies companies expressing their will to contribute to the continuous improvement of the sector.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/seal-commitment-professional-quality-cateb\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/serom-updates-its-identity-and-launches-new-corporate-website\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/Nova-imatge-SEROM-600x400.png)\"><\/span><h3>SEROM updates its identity and launches a new corporate website<\/h3><\/a><div class=\"excerpt\"><p>At SEROM, we are taking a step forward in the way we present ourselves and communicate our activity. The objective of this update is to reflect more accurately the current reality of the company: a construction firm specialized in projects of high technical demand, with a way of working based on rigor, reliability, and commitment to the result.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/serom-updates-its-identity-and-launches-new-corporate-website\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/serom-makes-progress-on-the-construction-of-the-prat-de-la-fraga-development-in-andorra-in-the-heart-of-winter\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/andorra-neu-600x400.jpg)\"><\/span><h3>SEROM makes progress on the construction of the Prat de la Fraga development in Andorra in the heart of winter<\/h3><\/a><div class=\"excerpt\"><p>Work on the Prat de la Fraga residential development in Andorra continues to advance at a good pace despite the demanding conditions typical of winter in mountain environments.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/serom-makes-progress-on-the-construction-of-the-prat-de-la-fraga-development-in-andorra-in-the-heart-of-winter\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/serom-renews-its-collaboration-agreement-with-aces\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/aces-acord-renovat-600x400.jpg)\"><\/span><h3>SEROM renews its collaboration agreement with ACES<\/h3><\/a><div class=\"excerpt\"><p>SEROM has renewed its agreement with ACES &#8211; Associaci\u00f3 Catalana d&#8217;Entitats de Salut for another year, thus reaffirming its commitment to the development of the healthcare sector and the continuous improvement of services related to the construction of healthcare facilities.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/serom-renews-its-collaboration-agreement-with-aces\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/new-pediatric-oncology-and-hematology-hospitalization-area-inaugurated-at-vall-dhebron\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/inauguracio-600x400.jpg)\"><\/span><h3>New pediatric oncology and hematology hospitalization area inaugurated at Vall d\u2019Hebron<\/h3><\/a><div class=\"excerpt\"><p>The new pediatric oncology and hematology hospitalization area at the Vall d&#8217;Hebron Barcelona Hospital Campus is now a reality. The space was recently presented at an institutional event<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/new-pediatric-oncology-and-hematology-hospitalization-area-inaugurated-at-vall-dhebron\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/yugo-alba-viu-university-residence-inaugurated-in-cerdanyola\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/acte-inaugural-600x400.jpg)\"><\/span><h3>Yugo Alba Viu University Residence Inaugurated in Cerdanyola<\/h3><\/a><div class=\"excerpt\"><p>As of today, Cerdanyola del Vall\u00e8s boasts a new facility dedicated to university talent. The new Yugo Alba Viu university residence, executed by SEROM<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/yugo-alba-viu-university-residence-inaugurated-in-cerdanyola\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/construction-of-residencial-nou-mirador-is-progressing-well-in-sant-joan-despi\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/residencial-nou-mirador-600x400.jpg)\"><\/span><h3>Construction of Residencial Nou Mirador is progressing well in Sant Joan Desp\u00ed<\/h3><\/a><div class=\"excerpt\"><p>The Residencial Nou Mirador project, in Sant Joan Desp\u00ed, continues to advance according to the planned schedule and is now entering a particularly relevant phase of structural execution.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/construction-of-residencial-nou-mirador-is-progressing-well-in-sant-joan-despi\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/serom-becomes-a-strategic-partner-of-the-barcelona-institute-of-building-construction\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/cateb-600x400.jpg)\"><\/span><h3>SEROM becomes a strategic partner of the Barcelona Institute of Building Construction<\/h3><\/a><div class=\"excerpt\"><p>SEROM has formalized a strategic alliance agreement with the Barcelona Institute of Building Construction (CATEB)<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/serom-becomes-a-strategic-partner-of-the-barcelona-institute-of-building-construction\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/grants-for-efficient-and-sustainable-mobility\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/1780474193719-d4c172ae-38db-486e-acd4-b3265869ae57_1-600x400.png)\"><\/span><h3>Grants for efficient and sustainable mobility<\/h3><\/a><div class=\"excerpt\"><p>SEROM has received grants for the acquisition of an electric fleet and charging infrastructure from the European Union under the NextGenerationEU Fund, within the framework of the Recovery Plan<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/grants-for-efficient-and-sustainable-mobility\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><\/div><\/div><\/div>\n\n<div style=\"height:6vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":0,"template":"","categories":[66],"class_list":["post-6288","servei","type-servei","status-publish","hentry","category-construction-services-hospitals"],"acf":[],"_links":{"self":[{"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/servei\/6288","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/servei"}],"about":[{"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/types\/servei"}],"version-history":[{"count":2,"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/servei\/6288\/revisions"}],"predecessor-version":[{"id":7356,"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/servei\/6288\/revisions\/7356"}],"wp:attachment":[{"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/media?parent=6288"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/categories?post=6288"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}