{"id":5931,"date":"2025-09-22T11:16:46","date_gmt":"2025-09-22T09:16:46","guid":{"rendered":"https:\/\/serom.cat\/serveis-i-manteniment\/clinics\/"},"modified":"2026-08-27T09:26:35","modified_gmt":"2026-08-27T07:26:35","slug":"clinics","status":"publish","type":"servei","link":"https:\/\/serom.cat\/en\/services-and-maintenance\/clinics\/","title":{"rendered":"Clinics"},"content":{"rendered":"\n<div class=\"wp-block-calafgrup-cabecera mod-cabecera f16_9\"><div class=\"slider\">\n<div class=\"wp-block-calafgrup-cabecera-interior slide\"><div class=\"maq-contenidor\" style=\"backdrop-filter: blur(0px)\"><div class=\"text\">\n<h1 class=\"wp-block-heading has-text-align-left is-style-com_titular_gegant has-blanc-color has-text-color has-link-color wp-elements-1\">Clinic Construction<\/h1>\n\n\n\n<p class=\"is-style-com-boto-taronja wp-block-paragraph\">Construction and adaptation of specialized healthcare centers<\/p>\n<\/div><\/div><div class=\"image\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-creu-blanca-mataro-scaled.jpg)\"><\/div><div style=\"background: #000; opacity: calc(30\/100);\" class=\"capa-color\"><\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-breadcrumb mod_breadcrumb\"><div class=\"callback-wrapper\"><\/div><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-franja mod-franja sense_background marge-superior- marge-inferior-gran padding_fondo _alineacio_\" data-aos=\"fade-up\" data-aos-delay=\"300\"><div class=\"maq-contenidor fullwidth\"><div class=\"maq-inner\">\n<div class=\"wp-block-calafgrup-columnes-grid mod-columnes-grid gap-gran defam_dsk-6 defam_tbl-6 defam_mob-12\" data-aos=\"fade-up\" data-aos-delay=\"300\">\n<div class=\"wp-block-calafgrup-columna-grid mod-cgw\"><div class=\"mod-grid-responsive valign-superior\">\n<h2 class=\"wp-block-heading is-style-com_titular_1 has-taronja-color has-text-color has-link-color wp-elements-2\">Healthcare spaces designed to inspire confidence from the outset<\/h2>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-columna-grid mod-cgw\"><div class=\"mod-grid-responsive valign-superior\">\n<p class=\"is-style-com_titular_peq wp-block-paragraph\">A clinic is not merely a medical center; it is a space where patients seek safety, professionalism, and comfort. Construction quality directly influences the perception of service and the efficiency of medical work. Therefore, every construction decision\u2014distribution, materials, lighting, or finishes\u2014has both a functional and experiential impact.  <\/p>\n\n\n\n<p class=\"is-style-default wp-block-paragraph\">At SEROM, we develop clinics with a comprehensive approach that combines technical rigor and attention to detail. We coordinate architecture, installations, and medical equipment to ensure the center is efficient, comfortable, and consistent with the identity of the promoter or healthcare operator.  We also build <a href=\"https:\/\/serom.cat\/serveis-i-manteniment\/hospitals\/\">hospitals<\/a> and <a href=\"https:\/\/serom.cat\/serveis-i-manteniment\/centres-datencio-primaria\/\">health centers<\/a>.<\/p>\n<\/div><\/div>\n<\/div>\n<\/div><\/div><div class=\"background\"><\/div><\/div>\n\n\n\n<div style=\"height:6vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-marquesrelacionades mod_noticies_relacionades com_relacionats\"><div class=\"intro\">\n<h2 class=\"wp-block-heading has-text-align-center is-style-com_titular_1 has-taronja-color has-text-color has-link-color wp-elements-3\">They trust us<\/h2>\n\n\n\n<div style=\"height:6vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><div class=\"callback-wrapper\"><\/div><\/div>\n\n\n\n<div style=\"height:6vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel mod-carrusel\" data-aos=\"fade-up\" data-aos-delay=\"300\"><div class=\"maq-inner\"><div class=\"slider_thumbs\">\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-2-scaled.jpg\"><img decoding=\"async\" width=\"300\" height=\"188\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-2-300x188.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"3822\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-2-300x188.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-2-1024x640.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-2-768x480.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-2-1536x960.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-2-2048x1280.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-2-1600x900.jpg 1600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-6-scaled.jpg\"><img decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-6-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"3074\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-6-300x200.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-6-1024x683.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-6-768x512.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-6-1536x1024.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-6-2048x1365.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-6-600x400.jpg 600w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-6-1600x900.jpg 1600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer.jpg\"><img decoding=\"async\" width=\"300\" height=\"300\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-300x300.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"3821\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-300x300.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-1024x1024.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-150x150.jpg 150w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-768x768.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-1536x1536.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-600x600.jpg 600w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-1600x900.jpg 1600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-scaled.jpg\"><img decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"3823\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-300x200.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-1024x683.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-768x512.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-1536x1024.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-2048x1365.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-600x400.jpg 600w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitari-1600x900.jpg 1600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-2.jpg\"><img decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-2-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"3824\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-2-300x200.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-2-1024x683.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-2-768x512.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-2-1536x1025.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-2-600x400.jpg 600w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-2.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-clinica-barraquer-2-1600x900.jpg 1600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-franja mod-franja sense_background marge-superior-gran marge-inferior-gran padding_fondo _alineacio_\" data-aos=\"fade-up\" data-aos-delay=\"300\"><div class=\"maq-contenidor fullwidth\"><div class=\"maq-inner\">\n<h2 class=\"wp-block-heading is-style-com_titular_gegant\">Design and execution at the service of medical activity<\/h2>\n<\/div><\/div><div class=\"background\"><\/div><\/div>\n\n\n\n<div style=\"height:6vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-ajedrez mod-escacs\">\n<div class=\"wp-block-calafgrup-ajedrez-interior interior cols_2 responsive-\" data-aos=\"fade-up\" data-aos-delay=\"300\"><div class=\"col esq imatge_fons\"><div class=\"bg-img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-4-scaled.jpg)\"><\/div><\/div><div class=\"col dreta bloc_text\"><div class=\"mig-contenidor\"><div class=\"text-wrapper\">\n<div style=\"height:10vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading is-style-com_titular_1 has-blanctext-color has-text-color has-link-color wp-elements-4\">Specialized Clinics <\/h3>\n\n\n\n<div style=\"height:6vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"is-style-default wp-block-paragraph\">We develop centers dedicated to specific specialties such as dentistry, assisted reproduction, outpatient surgery, diagnostic imaging, or oncological treatments. These projects require precise integration of technical equipment and optimized distribution to maximize efficiency and comfort. <\/p>\n\n\n\n<p class=\"is-style-default wp-block-paragraph\">We execute construction solutions adapted to intensive healthcare use, integrating combined structures, specialized envelope systems, technical zones, and areas with a high concentration of installations.<\/p>\n\n\n\n<div style=\"height:10vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div><div style=\"background: #878787;\" class=\"capa-color\"><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-ajedrez-interior interior cols_2 responsive-dreta_dalt\" data-aos=\"fade-up\" data-aos-delay=\"300\"><div class=\"col esq bloc_text\"><div class=\"mig-contenidor\"><div class=\"text-wrapper\">\n<div style=\"height:10vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading is-style-com_titular_1 has-taronja-color has-text-color has-link-color wp-elements-5\">Adaptation and expansion of existing clinics<br><\/h3>\n\n\n\n<div style=\"height:6vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"is-style-default has-taronja-color has-text-color has-link-color wp-elements-6 wp-block-paragraph\">We carry out renovations and expansions that allow for updating spaces, incorporating new technology, or improving functional distribution without excessive interruption to operations. We plan phases in detail to ensure continuity of care and reduction of operational impact. <\/p>\n\n\n\n<div style=\"height:10vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div><\/div><div class=\"col dreta imatge_fons\"><div class=\"bg-img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/construccio-sociosanitaria-laboratori-scaled.jpg)\"><\/div><\/div><\/div>\n<\/div>\n\n\n\n<div style=\"height:15vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div style=\"height:15vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group is-nowrap is-layout-flex wp-container-core-group-is-layout-8f761849 wp-block-group-is-layout-flex\">\n<div class=\"wp-block-calafgrup-element-landing mod-el-landing\"><a href=\"#\"><div class=\"text\"><\/div><div class=\"image\"><\/div><\/a><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-calafgrup-projectesrelacionats mod_projectes_relacionats com_relacionats\"><div class=\"intro\">\n<h2 class=\"wp-block-heading is-style-com_titular_gegant\">Healthcare Projects<\/h2>\n<\/div><div class=\"callback-wrapper\"><div class=\"slider-posts\"><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/projects\/remodeling-of-the-facades-of-the-mutuaterrassa-university-hospital\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/Mutua-de-Terrassa5-600x600.jpg)\"><\/span><h3>Rehabilitation of the facades of the M\u00fatuaTerrassa University Hospital<\/h3><\/a><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/projects\/hospital-del-mar\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/SG25080_6579-2-digital-600x600.jpg)\"><\/span><h3>Hospital del Mar<\/h3><\/a><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/projects\/urbania\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/Urbania_op2-600x600.jpg)\"><\/span><h3>Urbania<\/h3><\/a><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/projects\/hotel-ibis-barcelona-center\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/SEROM_HOTEL-IBIS_04-600x600.jpg)\"><\/span><h3>Hotel Ibis 22@<\/h3><\/a><\/div><\/div><\/div><\/div>\n\n\n\n<div style=\"height:3vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-right is-layout-flex wp-container-core-buttons-is-layout-50212b78 wp-block-buttons-is-layout-flex\" style=\"margin-top:0;margin-bottom:0;padding-right:var(--wp--preset--spacing--50);padding-left:var(--wp--preset--spacing--50)\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/projects\/\">View all projects<\/a><\/div>\n<\/div>\n\n\n\n<div style=\"height:10vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-noticiesrelacionades mod_noticies_relacionades com_relacionats_serom com_relacionats\"><div class=\"maq-contenidor\"><div class=\"intro\">\n<h2 class=\"wp-block-heading is-style-com_titular_gegant\">News<\/h2>\n<\/div><\/div><div class=\"callback-wrapper\"><div class=\"slider-posts\"><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/building-the-future-of-research\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/VHIO_render-web-600x400.jpg)\"><\/span><h3>Building the future of research<\/h3><\/a><div class=\"excerpt\"><p>SEROM has participated in various projects linked to leading institutions in the fields of biomedicine, oncology, and precision medicine\u2014spaces designed to drive research, innovation, and the scientific advances of today and tomorrow.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/building-the-future-of-research\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/seal-commitment-professional-quality-cateb\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/CatebxSerom_Segell-compromis-qualitat-professional-600x400.jpg)\"><\/span><h3>SEROM receives the Cateb Seal of Commitment to Professional Quality<\/h3><\/a><div class=\"excerpt\"><p>SEROM has been recognized with the Cateb Seal of Commitment to Professional Quality, a distinction that identifies companies expressing their will to contribute to the continuous improvement of the sector.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/seal-commitment-professional-quality-cateb\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/serom-updates-its-identity-and-launches-new-corporate-website\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/Nova-imatge-SEROM-600x400.png)\"><\/span><h3>SEROM updates its identity and launches a new corporate website<\/h3><\/a><div class=\"excerpt\"><p>At SEROM, we are taking a step forward in the way we present ourselves and communicate our activity. The objective of this update is to reflect more accurately the current reality of the company: a construction firm specialized in projects of high technical demand, with a way of working based on rigor, reliability, and commitment to the result.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/serom-updates-its-identity-and-launches-new-corporate-website\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/serom-makes-progress-on-the-construction-of-the-prat-de-la-fraga-development-in-andorra-in-the-heart-of-winter\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/andorra-neu-600x400.jpg)\"><\/span><h3>SEROM makes progress on the construction of the Prat de la Fraga development in Andorra in the heart of winter<\/h3><\/a><div class=\"excerpt\"><p>Work on the Prat de la Fraga residential development in Andorra continues to advance at a good pace despite the demanding conditions typical of winter in mountain environments.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/serom-makes-progress-on-the-construction-of-the-prat-de-la-fraga-development-in-andorra-in-the-heart-of-winter\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/serom-renews-its-collaboration-agreement-with-aces\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/aces-acord-renovat-600x400.jpg)\"><\/span><h3>SEROM renews its collaboration agreement with ACES<\/h3><\/a><div class=\"excerpt\"><p>SEROM has renewed its agreement with ACES &#8211; Associaci\u00f3 Catalana d&#8217;Entitats de Salut for another year, thus reaffirming its commitment to the development of the healthcare sector and the continuous improvement of services related to the construction of healthcare facilities.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/serom-renews-its-collaboration-agreement-with-aces\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/new-pediatric-oncology-and-hematology-hospitalization-area-inaugurated-at-vall-dhebron\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/inauguracio-600x400.jpg)\"><\/span><h3>New pediatric oncology and hematology hospitalization area inaugurated at Vall d\u2019Hebron<\/h3><\/a><div class=\"excerpt\"><p>The new pediatric oncology and hematology hospitalization area at the Vall d&#8217;Hebron Barcelona Hospital Campus is now a reality. The space was recently presented at an institutional event<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/new-pediatric-oncology-and-hematology-hospitalization-area-inaugurated-at-vall-dhebron\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/yugo-alba-viu-university-residence-inaugurated-in-cerdanyola\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/acte-inaugural-600x400.jpg)\"><\/span><h3>Yugo Alba Viu University Residence Inaugurated in Cerdanyola<\/h3><\/a><div class=\"excerpt\"><p>As of today, Cerdanyola del Vall\u00e8s boasts a new facility dedicated to university talent. The new Yugo Alba Viu university residence, executed by SEROM<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/yugo-alba-viu-university-residence-inaugurated-in-cerdanyola\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/construction-of-residencial-nou-mirador-is-progressing-well-in-sant-joan-despi\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/residencial-nou-mirador-600x400.jpg)\"><\/span><h3>Construction of Residencial Nou Mirador is progressing well in Sant Joan Desp\u00ed<\/h3><\/a><div class=\"excerpt\"><p>The Residencial Nou Mirador project, in Sant Joan Desp\u00ed, continues to advance according to the planned schedule and is now entering a particularly relevant phase of structural execution.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/construction-of-residencial-nou-mirador-is-progressing-well-in-sant-joan-despi\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/serom-becomes-a-strategic-partner-of-the-barcelona-institute-of-building-construction\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/cateb-600x400.jpg)\"><\/span><h3>SEROM becomes a strategic partner of the Barcelona Institute of Building Construction<\/h3><\/a><div class=\"excerpt\"><p>SEROM has formalized a strategic alliance agreement with the Barcelona Institute of Building Construction (CATEB)<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/serom-becomes-a-strategic-partner-of-the-barcelona-institute-of-building-construction\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><div class=\"post\"><a href=\"https:\/\/serom.cat\/en\/grants-for-efficient-and-sustainable-mobility\/\" class=\"foto-wrapper\"><span class=\"img\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/1780474193719-d4c172ae-38db-486e-acd4-b3265869ae57_1-600x400.png)\"><\/span><h3>Grants for efficient and sustainable mobility<\/h3><\/a><div class=\"excerpt\"><p>SEROM has received grants for the acquisition of an electric fleet and charging infrastructure from the European Union under the NextGenerationEU Fund, within the framework of the Recovery Plan<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\r\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/serom.cat\/en\/grants-for-efficient-and-sustainable-mobility\/\">+ info<\/a><\/div>\r\n<\/div><\/div><\/div><\/div><\/div><\/div>\n\n\n\n<div style=\"height:6vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":0,"template":"","categories":[67],"class_list":["post-5931","servei","type-servei","status-publish","hentry","category-construction-services-clinics"],"acf":[],"_links":{"self":[{"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/servei\/5931","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/servei"}],"about":[{"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/types\/servei"}],"version-history":[{"count":0,"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/servei\/5931\/revisions"}],"wp:attachment":[{"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/media?parent=5931"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/categories?post=5931"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}