{"id":5734,"date":"2026-04-13T17:50:07","date_gmt":"2026-04-13T15:50:07","guid":{"rendered":"https:\/\/serom.cat\/projectes\/parc-tauli-hospital\/"},"modified":"2026-06-15T07:15:35","modified_gmt":"2026-06-15T05:15:35","slug":"parc-tauli-hospital","status":"publish","type":"projecte","link":"https:\/\/serom.cat\/en\/projects\/parc-tauli-hospital\/","title":{"rendered":"Parc Taul\u00ed Hospital"},"content":{"rendered":"\n<div class=\"wp-block-calafgrup-cabecera mod-cabecera full\"><div class=\"slider\">\n<div class=\"wp-block-calafgrup-cabecera-interior slide\"><div class=\"maq-contenidor\" style=\"backdrop-filter: blur(0px)\"><div class=\"text\">\n<h1 class=\"wp-block-heading has-text-align-left is-style-com_titular_gegant\">Multipurpose hospital building at Parc Taul\u00ed Hospital<\/h1>\n\n\n\n<p class=\"is-style-com-boto-taronja wp-block-paragraph\"><a href=\"https:\/\/serom.cat\/en\/services-and-maintenance\/hospitals\/\">Construction of hospital buildings<\/a><\/p>\n<\/div><\/div><div class=\"image\" style=\"background-image:url(https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-scaled.jpg)\"><\/div><div style=\"background: #000; opacity: calc(30\/100);\" class=\"capa-color\"><\/div><\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-calafgrup-breadcrumb mod_breadcrumb\"><div class=\"callback-wrapper\"><\/div><\/div>\n\n<div class=\"wp-block-calafgrup-franja mod-franja sense_background marge-superior- marge-inferior-gran padding_fondo _alineacio_\" data-aos=\"fade-up\" data-aos-delay=\"300\"><div class=\"maq-contenidor fullwidth\"><div class=\"maq-inner\">\n<div class=\"wp-block-calafgrup-columnes-grid mod-columnes-grid gap-gran defam_dsk-6 defam_tbl-6 defam_mob-12\" data-aos=\"fade-up\" data-aos-delay=\"300\">\n<div class=\"wp-block-calafgrup-columna-grid mod-cgw\"><div class=\"mod-grid-responsive valign-superior\">\n<h2 class=\"wp-block-heading is-style-com_titular_1 has-taronja-color has-text-color has-link-color wp-elements-1\">A new boost to strengthen healthcare and adapt it to current challenges<br\/><\/h2>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-columna-grid mod-cgw\"><div class=\"mod-grid-responsive valign-superior\">\n<p class=\"is-style-com_titular_peq wp-block-paragraph\">Construction of the new Ripoll building at Parc Taul\u00ed Hospital in Sabadell, an action linked to the growth and modernization process of the hospital complex to respond to new care needs arising from COVID-19.<\/p>\n\n\n\n<p class=\"is-style-default wp-block-paragraph\">The building is developed across four above-ground floors, a semi-basement floor, and an upper technical level, connecting to the existing building via elevated walkways and a service tunnel. The new spaces house hospitalization units and a multipurpose ICU, while support areas and facilities are concentrated on the lower levels. <\/p>\n\n\n\n<p class=\"is-style-default wp-block-paragraph\">The project also includes preliminary demolition, earthmoving, and foundation work, serving as the basis for the development of the new facility.<\/p>\n<\/div><\/div>\n<\/div>\n<\/div><\/div><div class=\"background\"><\/div><\/div>\n\n<div class=\"wp-block-calafgrup-carrusel mod-carrusel\" data-aos=\"fade-up\" data-aos-delay=\"300\"><div class=\"maq-inner\"><div class=\"slider_thumbs\">\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-10.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"169\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-10-300x169.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"4847\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-10-300x169.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-10-1024x576.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-10-768x432.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-10-1536x864.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-10-1600x900.jpg 1600w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-10.jpg 1920w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-10-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-7-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-7-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"4845\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-7-300x200.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-7-1024x682.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-7-768x512.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-7-1536x1024.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-7-2048x1365.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-7-600x400.jpg 600w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-7-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-9-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-9-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"4846\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-9-300x200.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-9-1024x683.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-9-768x512.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-9-1536x1024.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-9-2048x1365.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-9-600x400.jpg 600w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-9-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-5-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-5-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"4843\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-5-300x200.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-5-1024x682.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-5-768x512.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-5-1536x1023.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-5-2048x1364.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-5-600x400.jpg 600w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-5-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-4-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-4-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"4842\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-4-300x200.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-4-1024x683.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-4-768x512.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-4-1536x1024.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-4-2048x1366.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-4-600x400.jpg 600w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-4-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-2-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-2-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"4840\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-2-300x200.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-2-1024x683.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-2-768x512.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-2-1536x1024.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-2-2048x1366.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-2-600x400.jpg 600w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-2-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n\n\n\n<div class=\"wp-block-calafgrup-carrusel-in thumbnail\"><a href=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-6-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-6-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"\" media_id=\"4844\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-6-300x200.jpg 300w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-6-1024x683.jpg 1024w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-6-768x512.jpg 768w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-6-1536x1024.jpg 1536w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-6-2048x1365.jpg 2048w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-6-600x400.jpg 600w, https:\/\/serom.cat\/wp-content\/uploads\/construccio-edifici-hospitalari-parc-tauli-6-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/div>\n<\/div><\/div><\/div>\n\n<div style=\"height:20vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-calafgrup-franja mod-franja sense_background marge-superior- marge-inferior- padding_fondo _alineacio_\" data-aos=\"fade-up\" data-aos-delay=\"300\"><div class=\"maq-contenidor estreta\"><div class=\"maq-inner\">\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"690\" src=\"https:\/\/serom.cat\/wp-content\/uploads\/Logos_CatSalut-1024x690.png\" alt=\"\" class=\"wp-image-4254\" style=\"aspect-ratio:2.245765144989951;width:280px;height:auto\" srcset=\"https:\/\/serom.cat\/wp-content\/uploads\/Logos_CatSalut-1024x690.png 1024w, https:\/\/serom.cat\/wp-content\/uploads\/Logos_CatSalut-300x202.png 300w, https:\/\/serom.cat\/wp-content\/uploads\/Logos_CatSalut-768x517.png 768w, https:\/\/serom.cat\/wp-content\/uploads\/Logos_CatSalut.png 1274w, https:\/\/serom.cat\/wp-content\/uploads\/Logos_CatSalut.png 1274w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-taronja-color has-alpha-channel-opacity has-taronja-background-color has-background\"\/>\n\n\n\n<p class=\"is-style-default wp-block-paragraph\"><strong>Project<\/strong> __ Multipurpose hospital building on the Parc Taul\u00ed Hospital campus<\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-taronja-color has-alpha-channel-opacity has-taronja-background-color has-background\"\/>\n\n\n\n<p class=\"is-style-default wp-block-paragraph\"><strong>Location<\/strong> __ Sabadell<\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-taronja-color has-alpha-channel-opacity has-taronja-background-color has-background\"\/>\n\n\n\n<p class=\"is-style-default wp-block-paragraph\"><strong>Year<\/strong> __ 2023<\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-taronja-color has-alpha-channel-opacity has-taronja-background-color has-background\"\/>\n\n\n\n<p class=\"is-style-default wp-block-paragraph\"><strong>Area<\/strong> __ 6,315 m\u00b2<\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-taronja-color has-alpha-channel-opacity has-taronja-background-color has-background\"\/>\n\n\n\n<p class=\"is-style-default wp-block-paragraph\"><strong>Construction Period<\/strong> __ 20 months<\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-taronja-color has-alpha-channel-opacity has-taronja-background-color has-background\"\/>\n\n\n\n<p class=\"is-style-default wp-block-paragraph\"><strong>Client<\/strong> __ Catalan Health Service<\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-taronja-color has-alpha-channel-opacity has-taronja-background-color has-background\"\/>\n\n\n\n<p class=\"is-style-default wp-block-paragraph\"><strong>Architects<\/strong> __ Jaume Espinal i Farr\u00e9, Alicia Vila Soler<\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-taronja-color has-alpha-channel-opacity has-taronja-background-color has-background\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Joint Venture<\/strong> __ CALAF Constructora, SEROM, CIMELSA<\/p>\n<\/div><\/div><div class=\"background\"><\/div><\/div>\n\n<div style=\"height:20vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-calafgrup-ajedrez mod-escacs\"><\/div>\n\n<div style=\"height:15vh\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n","protected":false},"excerpt":{"rendered":"<p>A new boost to strengthen healthcare and adapt it to current challenges.<\/p>\n","protected":false},"featured_media":5743,"template":"","categories":[62,78,65,66],"cat_projecte":[109],"class_list":["post-5734","projecte","type-projecte","status-publish","has-post-thumbnail","hentry","category-healthcare-sector-maintenance","category-healthcare-rehabilitation","category-construction-services-healthcare","category-construction-services-hospitals"],"acf":[],"_links":{"self":[{"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/projecte\/5734","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/projecte"}],"about":[{"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/types\/projecte"}],"version-history":[{"count":5,"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/projecte\/5734\/revisions"}],"predecessor-version":[{"id":7425,"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/projecte\/5734\/revisions\/7425"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/media\/5743"}],"wp:attachment":[{"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/media?parent=5734"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/categories?post=5734"},{"taxonomy":"cat_projecte","embeddable":true,"href":"https:\/\/serom.cat\/en\/wp-json\/wp\/v2\/cat_projecte?post=5734"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}