Multipurpose hospital building at Parc Taulí Hospital

Construction of hospital buildings

  • Services
  • Parc Taulí Hospital

Construction of the new Ripoll building at Parc Taulí Hospital in Sabadell, an action linked to the growth and modernization process of the hospital complex to respond to new care needs arising from COVID-19.

The building is developed across four above-ground floors, a semi-basement floor, and an upper technical level, connecting to the existing building via elevated walkways and a service tunnel. The new spaces house hospitalization units and a multipurpose ICU, while support areas and facilities are concentrated on the lower levels.

The project also includes preliminary demolition, earthmoving, and foundation work, serving as the basis for the development of the new facility.


Project __ Multipurpose hospital building on the Parc Taulí Hospital campus


Location __ Sabadell


Year __ 2023


Area __ 6,315 m²


Construction Period __ 20 months


Client __ Catalan Health Service


Architects __ Jaume Espinal i Farré, Alicia Vila Soler


Joint Venture __ CALAF Constructora, SEROM, CIMELSA